top of page

Airly Solar Farm
Project Status: OPERATING
Located in the beautiful Capertee region of NSW, the Airly Solar Farm is a 2MW behind-the-meter installation servicing greater than 20% of the overall electricity needs of the Airly Coal Mine.
2 MW
Energy Production
20%
Of Power Requirements
~1600t
CO2 Displaced

Stakeholders
The Airly solar farm provides around 20% of the power for the Airly coal mine

Community
Developing clean energy on mines offers an opportunity to bring economic vitality through tax revenue and jobs.

Environment
Prioritizing industrialized areas for solar Renewable installations can ease the pressure of converting natural and agricultural lands.
bottom of page

![AW Banpu Energy Australia Logo [c]-01.png](https://static.wixstatic.com/media/78eed2_10a7bd924d29415cbd172230b280958d~mv2.png/v1/fill/w_346,h_84,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/AW%20Banpu%20Energy%20Australia%20Logo%20%5Bc%5D-01.png)








